Project Management
Solar Power Plant Project51>
Site Survey
Detailed site survey to be conducted to verify prepared site layout and electrical parameters of site, earthing & protection system study, to understand electrical process.
Checking of Design of Solar System
- PV Panel mounting structure layout design
- Inverter location identification for inverter mounting
- LT Panel
- SLD
- Complete DC & AC side design
- Earthing system design
- All design preparation for CEIG approval
Solar Generation Estimation
- Shadow analysis
- Plant report verification
- Generation forecasting data preparation
Material List Verification
- As per site, Inspection of material list
- BOQ & BOM
- Datasheet of each material
Costing
- Checking for cost of each material
- Cash flow preparation
- Project viability report preparation & submission
Detailed Project Report
After identifying material brands & preparing all reports, we will proceed with a detailed project report of the solar power plant.
Tender Document Preparation (as per requirement)
- Complete tender draft for solar project
- Brand specification
- Project timeline
- Material datasheet & test report
- Designs
- Payment terms
- Generation guarantee
- Comprehensive AMC
- Bank guarantee (performance)
- I&C Terms & conditions
- AMC terms
Negotiation with L1
- Negotiation with L1 for cost
- Retention
Save Your Money
Save money on utilities or increase the value of your home by installing solar
Consult & Planning
Everyday the sun provides us with abundance of free energy by placing solar
Your Home Is Energy
Everyday the sun provides us with abundance of free energy by placing solar